Tuesday, August 5, 2014

Canard Leading Edge #7

I spent some time the other night test fitting the outboard leading edge panel to the right side of the canard so I could mark the locations of the ribs and spar on the wood.  I tried several different methods for strapping the plywood to the D-cell structure and I was surprised to find out that I got lucky when I attached the first panel because the panel needs to be attached to the top and then worked to the bottom.  Working from bottom to top is pretty much impossible.

Number of hours: 1.5
Total hours: 272.3