Now I fought the urge to title this post with a condom joke so I deserve credit for that. I marked and cut the notches in the nose ribs tonight that will hold the leading edge stringer. As I removed the stringer from its storage location, it broke into 3 pieces; so I will be gluing it back together over the next couple of days. I figured that my bad luck was out of the way so I mixed some epoxy with some micro balloons and glued the nose ribs to the spar.
Number of hours: 1.2
Total hours: 231.8
No comments:
Post a Comment