I added some more epoxy to the left hand main gear brace to fill a couple little gaps this evening. I mixed up a large batch of epoxy and glued the front sheeting on F1, sealing it shut. I will add a 60mm X 400mm X 1.5mm strip of ply to the front and back of F1 as a next step.
Number of hours: 1.2
Total hours: 108.1
No comments:
Post a Comment