I pulled the staples out of the right side yesterday and spent a little bit of time picking things up in the workshop.
I cut all the longerons and intercoastals (not sure if that is the correct term for the vertical pieces of spruce in the sides) then glued them in place tonight. I machined the slot in the reinforcement block that is the mounting point for the trim tab control at work today.
Hopefully I can get the gussets and other reinforcement blocks cut and glued tomorrow. No pictures today as it looks the same as the other side.
Number of hours: 1.7
Total hours: 72.0
No comments:
Post a Comment