I spent some miscellaneous time today cleaning up F2 and added notches for the longeron interfaces on 1 side. I added notes to F2 and F3 to aid in cutting the angles into the side faces. For fun, I set the bulkheads on the fuselage in their approximate locations; I was surprised at how big things really end up.
I cut 22 fuselage gussets from the 0.8mm plywood scraps that were lying around and then cut the seat gusset and control reinforcement gusset. I corrected the rear aft upper longeron as I hadn't extended it all the way up to the seat back and I glued in the reinforcement block for the canard control tube.
Number of hours: 3.5
Total hours: 68.7
No comments:
Post a Comment