I cut the shear webs for the aft faces of the tab spar and the tab facing spar and glued them in place. I realized that I forgot to varnish the interior of the tab spar as I added the webs so I covered all the interior surfaces with a healthy coat of epoxy before I closed it up.
Number of hours: 1.7
Total hours: 81.6
No comments:
Post a Comment